HO Scale Layout-- Post 8 (12/27) Mountain Construction Part 2

Posted by John Brady on

Plaster day, actually using 3/4 bag of Sculpta-Mold.
About an hours work.
Successful scenery is achieved one handful batch at a time. Some batches were made thick as peanut butter to stick on the steeper slopes, some batches as soupy as apple sauce for the gentler slopes.

 


Powered by Top Rated Local®